Longlead AI · free browser tools

Free tools for earlier, better-informed planning.

Practical tools for shielding and secure-facility planning. Each runs on your device, shows the formula or published basis behind its result, and keeps the limits visible.

No account · no submissions · no network calls with your answers

01

Physicist review required before design or construction

Radiation shielding calculator

Estimate illustrative lead, concrete, or steel thickness from isotope-specific half-value layers using HVL × log₂(initial intensity / target intensity).
Open free tool
02

Shielding vendor and physicist site survey required

MRI RF shielding calculator

Calculate MRI Larmor frequency and a preliminary below-cutoff waveguide length estimate. It keeps MRI OEM, site RF survey, and shielding-vendor requirements visible.
Open free tool
03

Field verification and shielding design required

RF shielding effectiveness

Compare a far-field solid-sheet shielding estimate with the effect of one seam or aperture, while keeping the limiting factor and calculation limits visible.
Open free tool
04

CTTA and AO requirements determine the actual project scope

SCIF cost estimator

Calculate a planning range from published SCIF construction rates, or view a vendor-specific container ROM, while keeping project requirements and site conditions visible.
Open free tool
05

AO and CTTA determination required

TEMPEST/SCIF checklist

Review selected TEMPEST and ICD 705 planning details, record visible gaps, and keep the items that require AO or CTTA determination separate from your self-check progress.
Open free tool
01

Useful before authoritative

The tool exposes its formula, cites the published material behind its figures, and tells you what still needs professional verification.

02

Private by construction

Calculations and saved progress remain in your browser. Nothing is submitted to Longlead, and the page makes no network request with your inputs.

03

Planning, not promises

The output is a preliminary estimate. The relevant qualified professional must confirm the design before construction.